Ghazi-Barotha Hydropower Project

A 1,450 MW run-of-river power project on the Indus below Tarbela, with a barrage at Ghazi and a 52 km power channel. Completed in 2004. It is a working WAPDA site, not a visitor attraction.

KindDam bridge
RegionPunjab
DistrictAttock

Overview

The Ghazi-Barotha project takes water from the Indus at a barrage near Ghazi, about 7 km downstream of Tarbela Dam. A concrete-lined power channel about 52 km long carries it to the powerhouse near Barotha. Wikipedia places the site in Attock District, Punjab, between Attock and Haripur. The owner is WAPDA, Pakistan's Water and Power Development Authority.

Plan your visit

Nearest town
Attock
Getting there

The barrage is near Ghazi, reached from Attock or Haripur. No official directions were found, so confirm the route locally. A car or hired driver is the usual option. More

Best months

Mar – May, Sep – Nov

How it works

The project is run-of-river: it has no large reservoir of its own. The barrage makes a small pond that smooths out Tarbela's daily releases and diverts water into the channel. The barrage has 20 standard bays, 8 undersluices and 8 head-regulator bays. Its design flood capacity is 18,700 cubic metres per second, the flood of record.

The channel is designed for up to 1,600 cubic metres per second, and is 9 m deep with a bottom width of 58.4 m. It follows the contour of the land, with hills on one side. Over the 63 km reach from Ghazi to Barotha the Indus falls about 76 m. Five penstocks (large pipes) feed five 290 MW Francis turbines at a head of 69 m. The installed capacity is 1,450 MW, and the water returns to the Indus below the powerhouse.

Why it was built

Tarbela is run mainly for irrigation, so its power output falls when irrigation demand is low. Ghazi-Barotha supplies peaking power when Tarbela's output is limited. Wikipedia says it is among Pakistan's most cost-effective power facilities.

History

A feasibility report was prepared in 1993 and the financing and construction agreement was signed on 7 March 1996. Wikipedia gives the total cost as about US$2.1 to 2.25 billion, with WAPDA contributing about US$1.1 billion and loans from the World Bank, Asian Development Bank, Japan Bank for International Cooperation and KfW, among others. The plant was inaugurated on 19 August 2003, when units 1 and 2 began running. The last generator was commissioned on 6 April 2004. Only about 110 dwellings had to be moved, to three villages built nearby by WAPDA.

What to see and do

There is little for casual visitors. The barrage, channel and powerhouse are working infrastructure and no visitor scheme was found.

  • The channel is visible from public roads in places, but confirm locally.
  • Tarbela Dam lies just upstream, and Attock has the fort and bridges at the Indus and Kabul confluence.

When to visit

Spring and autumn are the most comfortable.

Photography and safety

Dams are strategic sites. Do not photograph the dam works, powerhouse, intake structures, security posts or staff unless you have been told you may, and obey any guard. Do not swim in the channel or near the barrage: currents are strong.

Good to know

  • Travel advice. For foreign visitors: the UK FCDO (updated 27 October 2026, checked 17 November 2026) does not name Attock, but advises against all but essential travel to Swabi and against travel to parts of KP nearby. The barrage is at the Punjab-KP border area, so read the live page.
  • Fees. No visitor fee or opening hours were found from an official source; current details will be added soon.

Highlights

  • Run-of-river project on the Indus
  • 1,450 MW, completed 2004
  • Power channel about 52 km long
  • About 7 km below Tarbela Dam

Getting there

The barrage is near Ghazi, reached from Attock or Haripur. No official directions were found, so confirm the route locally. A car or hired driver is the usual option.

Tips

  • Confirm access locally before you go.
  • Do not photograph the barrage or powerhouse.
  • Stay away from the channel and barrage water.

Sources and last checked

Last checked Confidence low2 sources4 still to check
Last checked
Method
Desk research from published sources
Confidence
low
Checked by
trek.pk research team

Researched from published sources; not yet checked on the ground by our team. Spot something out of date? Report a mistake.

Sources

Still to be checked on the ground (4)

  • Visitor access and photography rules
  • Exact point for the coordinates (Wikipedia gives 33.78 N, 72.26 E)
  • Construction start date: Wikipedia gives 1995 in the lead and 1999 in the infobox
  • Total cost: Wikipedia gives US$2.1 billion and US$2.25 billion