HighwayBalochistan

N-30 Basima-Khuzdar

The N-30 is a 110 km link road in Balochistan between Khuzdar on the N-25 and Basima on the N-85. It is a thinly serviced road with no sights of its own; the UK FCDO advises against all travel in Balochistan.

From / toKhuzdar to Basima
Distance110 km
Best monthsOct – Mar
Howcar, bus
RoadsN-30

Overview

The N-30 is a short National Highway Authority road in Balochistan linking Khuzdar with Basima. Wikipedia lists it at 110 km; a Pak Observer report of the completed project gives 106 km, and OSRM measures 109 km by road, about 1 hour 25 minutes (16 November 2026). It is mainly a link between the N-25 at Khuzdar and the N-85 at Basima, and so a link between the Karachi-Quetta road and the south-west of the province.

Read this first

Ask the district administration or local police about current conditions before you go. For foreign visitors: the UK FCDO (updated 27 October 2026, checked 16 November 2026) advises against all travel to Balochistan Province. The whole N-30 is in Balochistan. This is a reference page and not a recommendation.

Route and stops

  • Khuzdar (km 0): main city of central Balochistan on the N-25, about 1,237 m up.
  • Basima (km 109): a small town in Washuk District, where the road meets the N-85.

There are no known other named towns on the road, and none is listed by Wikipedia.

About Khuzdar

Khuzdar sits at about 1,237 m at the head of a narrow valley ringed by mountains, and is the third-largest city in Balochistan (218,112 people in the 2023 census). Brahui is the main language, spoken by 93 per cent of residents, so it is the largest Brahui-speaking city. Wikipedia says the name may come from a Middle Persian word for "place of silk". In the early Islamic period it was the capital of the Turan province, and under the Abbasids it lay on a caravan route linking Iran, Kalat, Khuzdar and Multan. Later it came under the Khanate of Kalat. The climate is semi-arid, with about 286 mm of rain a year, mostly in the July and August monsoon; some summers have none. The record high is 43 degrees C and the record low is minus 8.

Road conditions

Gwadar Pro (20 June 2023, copying an NHA statement) reported the NHA had completed the 106 km Basima-Khuzdar road as a CPEC project, with light and heavy traffic already using it and a formal inauguration by the Prime Minister still expected. It gives the cost as Rs11.7 billion; an INP report of 18 May 2026 lists the same 106 km project as completed at Rs19.188 billion, started October 2019, with no completion date given. There is no known report of a formal opening, and none on the surface or on maintenance. A Dawn report in 2021 had put progress at about 60 per cent.

Where it fits

The N-30 and N-85 together form a corridor from Khuzdar south-west through Basima and Panjgur to Hoshab, where the M-8 motorway corridor towards Awaran and Khuzdar meets it. Coming from Karachi, you reach Khuzdar on the N-25 and turn west here. Coming from Quetta, the N-25 passes Kalat and Surab before Khuzdar, and Surab is also the other end of the N-85. This makes the N-30 a short cut across the middle of the province, not a destination.

When to go

Khuzdar is high and cooler than the coast; winter nights can be cold. Spring and autumn are easiest, and summer is hot on the lower sections.

Hazards and incidents

There is no known verified, dated incident report for this specific road. Balochistan-wide, Arab News (5 August 2026) reported 107 trucks burned on provincial highways between January and early August 2026, and Dawn reported on 30 March 2025 that night travel was banned on several highways. The N-30 was not named in the Dawn list.

Fuel and services

Services are thin. Fill up at Khuzdar, carry water and food, and expect no repair shops between towns. We have no verified list of fuel stations.

What to see

Nothing on the road itself is a visitor sight. Khuzdar is the nearest place with a page on this site.

Safety by section

  • Khuzdar to Basima (Balochistan): For foreign visitors: the UK FCDO advises against all travel. Check current local conditions with the Balochistan government and police before any journey, and travel only in daylight.

Highlights

  • Links Khuzdar and Basima
  • Connects the N-25 with the N-85
  • About 110 km, roughly 1 hour 25 minutes

Stops

  1. Khuzdarkm 0Junction with the N-25
  2. Basimakm 109Junction with the N-85

km: distance from the start along the route.

Where to stay, eat and fuel up

Places to stay

Places to eat

Essential services fuel stations, mechanics, ATMs, banks, pharmacies and hospitals and clinics

Fuel

Mechanics and tyre shops

ATMs

Banks and money exchange

Pharmacies

Hospitals and clinics

All listings on the N-30

Listings come from Google Maps data and are unverified: phone numbers, opening months and prices may have changed. Report a problem · Own one of these? Claim it

More safety notes

  • FCDO (updated 27 October 2026, checked 16 November 2026): advises against all travel to Balochistan Province.
  • Regional context: 107 trucks burned on Balochistan highways January to early August 2026 (Arab News); night travel banned on several highways from March 2025 (Dawn). No dated incident found for the N-30 itself.
  • Daylight only; get current local advice.

Tips

  • Read the current FCDO advice before planning.
  • Travel in daylight only.
  • Fill up at Khuzdar and carry water.

Photos we still need: the N-30 road itself and the Basima end (no openly licensed photo found). Send us yours

Sources and last checked

Last checked Confidence low10 sources5 still to check
Last checked
Method
Desk research from published sources
Confidence
low
Checked by
trek.pk research team

Researched from published sources; not yet checked on the ground by our team. Spot something out of date? Report a mistake.

Sources

Still to be checked on the ground (5)

  • Current road surface (no recent condition report found)
  • Exact completion date and any formal opening (reported complete by June 2023; no opening report found)
  • Length: Wikipedia 110 km, NHA/INP/Gwadar Pro 106 km (project), OSRM 109 km
  • Fuel and services along the road (nothing found)
  • Security and checkposts (no dated report for this road; FCDO advises against all travel in Balochistan)

Photo 1 of 1

Buildings of Khuzdar city with hills behind
A view of Khuzdar city, a main stop on the N-25 (2023).

Photo: Khuzdar Balochistan, with thanks · CC BY-SA 4.0 · via Wikimedia Commons · temporary stand-in photo

Nearby and related

Help us improve trek.pk

Share feedback