HighwayBalochistan

N-85 Surab-Basima-Panjgur-Hoshab

The N-85 links Surab on the N-25 with Hoshab near Turbat via Basima and Panjgur, 487 km by the Wikipedia list. Remote, thinly served, and the UK FCDO advises against all travel in Balochistan.

From / toSurab to Hoshab
Distance487 km
Best monthsNov – Feb
Howcar, bus
RoadsN-85

Overview

The N-85 is the road from Surab on the N-25 south-west through Basima, Nag and Panjgur to Hoshab, near Turbat. Wikipedia lists it at 487 km, but a Times of Islamabad report of 13 December 2016 gives the Surab-Hoshab road as 449 km, which matches our OSRM measurement (449 km, about 5 hours 30 minutes without stops, 16 November 2026). Treat 487 km as an outlier. It opens up the south-west of Balochistan: Panjgur's date country and the Makran. Wikipedia and OpenStreetMap give the southern end as Hoshab (also spelled Hushab or Hashab), in Kech district.

Read this first

Ask the district administration or local police about current conditions before you go. For foreign visitors: the UK FCDO (updated 27 October 2026, checked 16 November 2026) advises against all travel to Balochistan Province. The whole N-85 is in Balochistan. This is a reference page, not a recommendation.

Route and stops

Distances are from Surab (OSRM).

  • Surab (km 0): valley town on the N-25 and the start of the road.
  • Basima (km 87): junction with the N-30, which runs 109 km to Khuzdar.
  • Nag: a stop on the route (spelled Nag by Wikipedia and the Times of Islamabad; the FWO title uses Nag too); we did not measure it.
  • Panjgur (km 301): date-growing river oasis, about 980 m up.
  • Hoshab (km 449): end of the N-85; the M-8 motorway corridor towards Awaran and Khuzdar passes near here.

Road conditions

Wikipedia still calls the N-85 under construction, but it is out of date. Times of Islamabad (13 December 2016) reported a formal opening planned for 14 December 2016 at a cost of Rs 22 billion, and a Zameen report of 25 May 2021 lists the Quetta-Hoshab road (N-85) as completed and operational. The exact completion date is unconfirmed. A separate widening project is a later job. The adjoining M-8 sections are still under construction: ProPakistani (29 October 2026) lists Hoshab-Awaran (146 km) at 64 per cent and Awaran-Naal (168 km) at 52 per cent, both due June 2027. The road is dry desert and hill country, very hot in summer, and long stretches have no shade or shelter.

Hazards and incidents

  • Construction deaths: Dawn reported on 2 July 2025 that 42 FWO workers died during N-85 construction, which shows the long-standing security risk.
  • Regional context: Arab News (5 August 2026) reported 107 trucks burned on Balochistan highways from January to early August 2026, mostly on the N-25 and N-40. There is no verified, dated incident on the N-85 itself.
  • Night travel: Dawn's 30 March 2025 list of night restrictions did not name the N-85, but several neighbouring highways were covered.

Fuel and services

Towns on the route are small and far apart, especially from Basima to Panjgur (about 214 km). We have no verified list of fuel stations or repair shops. Fill up at Surab, carry water, food and a spare tyre, and expect no phone signal in places.

What to see

Panjgur is the one place on the road with a documented identity. Wikipedia describes the district as one of Pakistan's principal producers of Mazafati dates, sold at home and exported, worth about 10 per cent of district revenue. The town sits in a highland basin at about 980 m. A 985 AD Arabic source records Panjgur as the capital of Makran, and the Gichki dynasty ruled Makran from about 1740 to 1955. The Rakhshan River runs through the middle of the district, and 99.63 per cent of residents speak Balochi as their mother tongue. Long-distance buses on the N-85 are the main way to travel (Wikipedia), and Panjgur has an airport.

Panjgur dates, the district's best-known crop (open photo 2 of 2 full screen)
Panjgur dates, the district's best-known crop (small image).

Photo: Panjgur District, with thanks · CC BY-SA 4.0 · via Wikimedia Commons · temporary stand-in photo

Turbat lies a short way south of Hoshab. See the pages for each.

Safety by section

  • Surab to Basima: Balochistan; FCDO advises against all travel.
  • Basima to Hoshab (Washuk, Kharan and Panjgur areas, then Kech): same advice, and this is a remote stretch with little help. Get current local advice and travel in daylight only.

Highlights

  • Remote road from Surab to the Makran
  • Passes Basima and Panjgur
  • Panjgur's date orchards
  • Links the N-25, N-30 and M-8 corridors

Stops

  1. Surabkm 0Start, on the N-25
  2. Basimakm 87Junction with the N-30 to Khuzdar
  3. Panjgurkm 301Date-growing oasis
  4. Hoshabkm 449End of the N-85; Turbat lies a short way south

km: distance from the start along the route.

Numbers follow the stops in order. The map shows the 3 stops that have a trek.pk page, not the road itself.

Where to stay, eat and fuel up

Essential services fuel stations, ATMs and hospitals and clinics

Fuel

ATMs

Hospitals and clinics

All listings on the N-85

Listings come from Google Maps data and are unverified: phone numbers, opening months and prices may have changed. Report a problem · Own one of these? Claim it

More safety notes

  • FCDO (updated 27 October 2026, checked 16 November 2026): advises against all travel to Balochistan Province.
  • Context: 42 FWO workers died during N-85 construction (Dawn, 2 July 2025); 107 trucks burned on Balochistan highways January to early August 2026 (Arab News). No dated incident found for the N-85 itself.
  • Daylight only; current local advice.

Tips

  • Read the current FCDO advice before planning.
  • Fill up at Surab; the next reliable stop may be 200 km away.
  • Carry water and food.
  • Do not drive at night.

Photos we still need: the N-85 road or the Panjgur date groves. Send us yours

Sources and last checked

Last checked Confidence low12 sources5 still to check
Last checked
Method
Desk research from published sources
Confidence
low
Checked by
trek.pk research team

Researched from published sources; not yet checked on the ground by our team. Spot something out of date? Report a mistake.

Sources

Still to be checked on the ground (5)

  • Exact completion date of the FWO road (formal opening reported for 14 December 2016; FWO page blocked)
  • Position of Nag on the ground (we did not measure it)
  • Fuel availability between Basima and Panjgur (nothing found)
  • Security and checkposts (no dated report for this road; FCDO advises against all travel in Balochistan)
  • Current road surface (no report found)

Photo 1 of 2

A two-lane road through a small desert town, photographed through a windscreen
Surab, at the junction of the N-25 and N-85.

Photo: Najamuddin Shahwani, with thanks · CC BY 3.0 · via Wikimedia Commons · temporary stand-in photo

Nearby and related

Help us improve trek.pk

Share feedback