Karot Hydropower Project

A 720 MW run-of-river project on the Jhelum, commissioned in 2022. It sits on the Punjab and Azad Kashmir border area near Kahuta and Kotli, and is a working power site.

KindDam bridge
RegionPunjab
DistrictRawalpindi

Overview

Karot Hydropower Project is on the Jhelum River, about 1.7 km upstream of Karot Bridge and 74 km upstream of Mangla Dam. Wikipedia gives 720 MW from four 180 MW Francis turbines and commissioning on 29 June 2022. Its summary box puts it in Punjab, and it is reached by the Islamabad-Kahuta-Kotli road, about 29 km from Kahuta and 65 km from Islamabad.

Plan your visit

Nearest town
Kahuta
Getting there

By Wikipedia, via the Islamabad-Kahuta-Kotli road, about 29 km from Kahuta and 65 km from Islamabad. Confirm the route and any checkpoints locally. More

Best months

Mar – May, Sep – Nov

  • Karot Hydropower Project
  • Related place nearby: Islamabad

The project

  • Dam. An asphalt-core rockfill gravity dam 95.5 m high. Crest length is given as 320 m in the text and 460 m in the summary box.
  • Reservoir. About 164.5 million cubic metres, up to 27 km long.
  • Powerhouse. A power intake on the right bank feeds headrace tunnels to a cavern powerhouse. Water returns to the river through a tailrace channel.
  • Output. About 3,436 GWh a year, fed into the national grid.
  • Backers. China Three Gorges Corporation sponsored the project, which is part of the China-Pakistan Economic Corridor (CPEC) and was the first investment of the Silk Road Fund. Construction began in 2016 and financial close was reached in February 2017. The cost is given as US$1.42 billion in one place and about US$2 billion in another.
  • Resettlement. 72 homes and 58 businesses were relocated, along with about 2.8 km of the Karot-Kotli road and 8.9 km of the Azad Pattan-Kahuta road.

What to see and do

This is a working power site. No visitor scheme or facilities were found in the sources. The reservoir can be seen from public roads in places; confirm locally. The Jhelum River and Islamabad pages give context.

When to visit

Spring and autumn.

Photography and safety

Dams are strategic sites. Do not photograph the dam works, powerhouse, intake structures, security posts or staff unless you have been told you may, and obey any guard. The Line of Control is not far away on the Kotli side.

Good to know

  • Travel advice. For foreign visitors: the UK FCDO (updated 27 October 2026, checked 17 November 2026) does not name Kahuta, but advises against all but essential travel to Azad Jammu and Kashmir, which includes Kotli, and against all travel within 10 miles of the Line of Control. Read it before you plan a trip.
  • Fees. No visitor fee or opening hours were found from an official source; current details will be added soon.

Highlights

  • Jhelum River, commissioned 2022
  • 720 MW, four turbines
  • Dam about 95.5 m high
  • About 65 km from Islamabad

Getting there

By Wikipedia, via the Islamabad-Kahuta-Kotli road, about 29 km from Kahuta and 65 km from Islamabad. Confirm the route and any checkpoints locally.

Tips

  • Check FCDO advice for AJK before crossing towards Kotli.
  • Do not photograph the dam works or guards.
  • Confirm road access locally.

Sources and last checked

Last checked Confidence low2 sources3 still to check
Last checked
Method
Desk research from published sources
Confidence
low
Checked by
trek.pk research team

Researched from published sources; not yet checked on the ground by our team. Spot something out of date? Report a mistake.

Sources

Still to be checked on the ground (3)

  • Visitor access
  • District (Rawalpindi is from Wikipedia's category list)
  • Dam crest length (320 m or 460 m) and project cost (US$1.42 billion or about US$2 billion) differ within the source

Nearby and related

Help us improve trek.pk

Share feedback