Mohmand Dam

A concrete-faced rockfill dam under construction on the Swat River in Mohmand District, north of Peshawar. It is a construction site in an area covered by FCDO advice against all travel.

KindDam bridge
RegionKhyber Pakhtunkhwa
DistrictMohmand

Overview

Mohmand Dam is being built on the Swat River in Mohmand District, Khyber Pakhtunkhwa, about 37 km north of Peshawar and 5 km upstream of Munda Headworks. It was earlier called Munda Dam. WAPDA, the national water and power authority, lists it as under construction: a concrete-faced rockfill dam (a rockfill embankment with a concrete slab on the water side), 213 m high, with 800 MW of power.

Plan your visit

Nearest town
Peshawar
Getting there

Wikipedia gives about 37 km north of Peshawar. Public access to the works is not expected, and FCDO advises against all travel to Mohmand. More

Best months

Mar – May, Sep – Nov

  • Mohmand Dam
  • Related place nearby: Peshawar

Why it is being built

The dam has three jobs: hydropower, irrigation and flood control. It is meant to hold back flood water that would otherwise reach Nowshera and Charsadda downstream. A Supreme Court inquiry commission into the July 2010 floods concluded that damage at Charsadda, Peshawar, Nowshera and Munda Headworks would have been minimal had the dam existed.

Key figures

Published figures differ between sources.

  • Height and length. 213 m high and about 760 m long (Wikipedia).
  • Power. 800 MW installed. Yearly generation is 2,862 GWh in WAPDA's figure and 2,407 GWh in Wikipedia's.
  • Storage. Live storage is 0.676 million acre-feet in both. Gross storage is 1.239 million acre-feet on WAPDA's page and about 1.293 million in Wikipedia.
  • Irrigation. WAPDA gives 16,737 acres of command area, split between the left and right banks.
  • Cost. Wikipedia lists Rs 340 billion. France granted EUR 61 million for this project and the Harpo hydropower project in Gilgit-Baltistan.

Timeline

  • March 2000: feasibility study completed.
  • 2010 to 2011: expressions of interest invited and consultants chosen.
  • April 2017: detailed engineering design completed.
  • 26 April 2018: ECNEC, the national economic council's executive committee, approved the project cost.
  • 2 May 2019: construction began (Wikipedia).
  • 21 May 2019: WAPDA signed a contract for design, construction supervision and contract management with a consultant group led by NESPAK.

WAPDA's page gives a proposed completion of December 2025 with no progress update. Wikipedia gives December 2027 in its summary box and 2026 in its text. Check WAPDA for the latest status.

What to see and do

There is nothing to visit. It is an active construction site, not an attraction.

Getting there

Public access to the works is not expected. An OSRM estimate gives about 49 km by road from the centre of Peshawar, but the route and journey time are unreliable for a restricted site.

When to visit

Not applicable.

Photography and safety

Dams are strategic sites. Do not photograph the dam works, powerhouse, intake structures, security posts or staff unless you have been told you may, and obey any guard. Do not stop or photograph near the works.

Good to know

  • Travel advice. For foreign visitors: the UK FCDO (updated 27 October 2026, checked 17 November 2026) advises against all travel to Mohmand and Peshawar districts. Read the live page before you plan anything.
  • Status. Under construction. The dates above are from WAPDA and Wikipedia and are not forecasts by this site.

Highlights

  • Under construction on the Swat River
  • 213 m high, 800 MW (WAPDA)
  • Construction began May 2019 (Wikipedia)
  • About 37 km north of Peshawar

Tips

  • Check the FCDO page: Mohmand is covered.
  • Do not stop or photograph near the works.
  • Confirm status with WAPDA.

Sources and last checked

Last checked Confidence medium4 sources2 still to check
Last checked
Method
Desk research from published sources
Confidence
medium
Checked by
trek.pk research team

Researched from published sources; not yet checked on the ground by our team. Spot something out of date? Report a mistake.

Sources

Still to be checked on the ground (2)

  • Latest construction status and completion date
  • Whether any area is open to the public