MotorwayBalochistan

M-8 Ratodero-Gwadar Motorway

The M-8 is a partly built 892 km road from Ratodero in Sindh through Khuzdar, Awaran and Turbat to Gwadar. The Hoshab-Awaran-Khuzdar gap is not complete. For foreign visitors: the UK FCDO advises against all travel to Balochistan.

From / toRatodero to Gwadar
Distance892 km
Time1 day
Best monthsNov – Mar
Howcar, bus
RoadsM-8

The journey

Last verified: 17 November 2026.

Read this first

For foreign visitors: the UK FCDO (updated 27 October 2026, checked 16 November 2026) advises against all travel to Balochistan, and against all but essential travel to Sindh north of and including Nawabshah, where Ratodero lies. We list the M-8 for completeness, not as a recommended route.

Status

The M-8 is partly open. Its length is 892 km (Wikipedia, and Dawn on 3 June 2026). The 870 km figure comes from a 2015 report on construction progress and is not a different total. Construction began on 15 October 2004. The Gwadar to Hoshab section (193 km, two lanes) was inaugurated in February 2016. The Ratodero to Khuzdar section is reported as operational, apart from a difficult stretch about 70 km east of Khuzdar over the northern Kirthar range. The Hoshab to Awaran to Khuzdar section is the gap. Funding was approved in 2020 and in June 2026 the federal budget reportedly set aside Rs4.5 billion for the Hoshab-Awaran stretch. A contract for Awaran to Naal has also been reported, with no date on the article we saw. Wikipedia says no completion timeline is available. Treat all status reports as unconfirmed. Available sources are mostly news items without clear dates, and they disagree on which sections are funded, awarded or finished.

Route and stops

The road leaves the N-55 area at Ratodero, runs west via Shahdadkot, Khuzdar (N-25), Awaran, Hoshab and Turbat, and joins the Makran Coastal Highway (N-10) east of Gwadar. It crosses the Dasht River and passes near the Mirani Dam, and it forms part of the central route of the China-Pakistan Economic Corridor (CPEC). It was planned as four lanes and has been built as two, with two more to be added later.

A wide paved motorway with a rock cutting on the right and several 4x4 vehicles parked along the edge. (open photo 2 of 2 full screen)
A section of the M-8 motorway in Balochistan with vehicles parked on the shoulder.

Photo: Shehzad.abbasi, with thanks · CC BY-SA 4.0 · via Wikimedia Commons · temporary stand-in photo

Wikipedia gives two section lengths: Gwadar to Hoshab is 193 km, and Hoshab to Awaran to Khuzdar is 146 km. Counting back from the 892 km total, that puts Hoshab about 699 km and Khuzdar about 553 km from Ratodero. These are derived figures, not signed distances. Wikipedia lists no kilometre markers. Between Hoshab and Gwadar the M-8 follows the older N-85 alignment, and in 2015 the road was reported complete there except for some bridges.

What the road passes

  • Ratodero and Shahdadkot (Sindh). The flat Indus plain, before the road climbs into the hills.
  • The northern Kirthar range. About 70 km east of Khuzdar the road crosses the northern Kirthar range. This is the section described as difficult.
  • Khuzdar. Headquarters of Khuzdar District at 1,237 m, at the top of a narrow valley. It was the main city of Jhalawan in the Khanate of Kalat. Wikipedia gives its 2023 population as 218,112, the third largest in Balochistan. Rainfall is low and erratic, mostly in July and August.
  • Awaran and Hoshab. These lie on the section that is not finished.
  • Turbat. Headquarters of Kech District, at 129 m on the left bank of the Kech River. It is among the hottest cities in South Asia: Wikipedia cites a reading of 53.7 degrees Celsius on 28 May 2017. Date palms grow in the neighbourhoods, and dates are the town's best-known product. Its 2023 population was 268,625, the second largest city in Balochistan after Quetta. Wikipedia links the remains of a fort to the Sassi and Punnu legend. Gwadar port is about 180 km south-west.
  • Gwadar. The western end, on the Makran Coast.

Tolls and M-Tag

Wikipedia says the Hoshab to Gwadar section is untolled and that the M-8 is the only operational Pakistani motorway without M-Tag. We have not confirmed this from the NHA. Current fees, if any, will be added soon.

Fuel and services

Distances between fuel stops are long and facilities are basic. Dawn (3 June 2026) described the M-8 and the N-10 as new and smooth but short of rest stops, food and water, and said night-time public transport is often banned during threats of violence. Carry fuel, water and spares. Mobile coverage is patchy in places.

Weather

Summers are very hot in Makran. Flash floods can cut roads after heavy rain. Check PMD and local advice.

Safety

Do not travel here on the strength of this page. Follow the FCDO advice, check with local authorities and the Motorway Police (130 on NHA roads) and travel only in daylight with local knowledge.

What to see near Gwadar

Gwadar and Hingol National Park lie along the coast, reached more usually from Karachi on the Makran Coastal Highway. See that route page for the coast road and the latest advice.

Highlights

  • 892 km planned, partly open
  • Gwadar-Hoshab section inaugurated February 2016
  • Middle section still unfinished
  • FCDO: against all travel to Balochistan

Stops

  1. Ratoderokm 0Eastern end, Sindh
  2. ShahdadkotTown on the route
  3. Khuzdarkm 553Junction with the N-25; about 553 km from Ratodero (derived)
  4. AwaranTown on the unfinished section
  5. Hoshabkm 699Start of the open Gwadar section; about 699 km (derived)
  6. TurbatTown on the route
  7. Gwadarkm 892Western end; joins the Makran Coastal Highway

km: distance from the start along the route.

Numbers follow the stops in order. The map shows the 4 stops that have a trek.pk page, not the road itself.

Road conditions

Two lanes where built. The Hoshab-Awaran-Khuzdar middle section is under development.

Where to stay, eat and fuel up

Essential services fuel stations, mechanics, ATMs, banks, pharmacies and hospitals and clinics

Fuel

All fuel stations on the M-8 (43)

Mechanics and tyre shops

All mechanics on the M-8 (7)

ATMs

All ATMs on the M-8 (21)

Pharmacies

All pharmacies on the M-8 (20)

Hospitals and clinics

All hospitals and clinics on the M-8 (20)

All listings on the M-8

Listings come from Google Maps data and are unverified: phone numbers, opening months and prices may have changed. Report a problem · Own one of these? Claim it

More safety notes

For foreign visitors: the UK FCDO advises against all travel to Balochistan.

Tips

  • Read the FCDO advice first
  • Do not rely on status reports
  • Carry fuel and water

Photos we still need: Khuzdar and the northern Kirthar section of the M-8. Send us yours

Sources and last checked

Last checked Confidence low10 sources5 still to check
Last checked
Method
Desk research from published sources
Confidence
low
Checked by
trek.pk research team

Researched from published sources; not yet checked on the ground by our team. Spot something out of date? Report a mistake.

Sources

Still to be checked on the ground (5)

  • Status of the Hoshab-Awaran-Khuzdar section: ECNEC approved Rs26bn on 16 July 2020 and contracts for Awaran to Naal were reported in 2021 to 2022; there is no 2026 progress report
  • Toll and M-Tag status (Wikipedia only; the NHA page could not be opened)
  • Condition and security on the road (on the ground; Dawn June 2026 says the built parts are smooth but have few facilities)
  • Km markers (none found in any source)
  • Km figures for Khuzdar (about 553) and Hoshab (about 699) are derived from Wikipedia's section lengths (193 km and 146 km) and the 892 km total; no signed distances found

Photo 1 of 2

A paved two-lane motorway with yellow edge lines leading between brown rocky hills under a cloudy sky.
The M-8 motorway in Balochistan, running through dry mountain country.

Photo: Shehzad.abbasi, with thanks · CC BY-SA 4.0 · via Wikimedia Commons · temporary stand-in photo

Nearby and related

Help us improve trek.pk

Share feedback