Dasu Dam

A large hydropower dam under construction on the Indus near Dasu in Kohistan. It is a construction site for a 4,320 MW project and is not open to visitors.

KindDam bridge
RegionKhyber Pakhtunkhwa
DistrictKohistan

Overview

Dasu Dam is being built on the Indus near Dasu in Kohistan District, Khyber Pakhtunkhwa. Wikipedia describes a roller-compacted concrete gravity dam, 242 m high and 570 m long, with 4,320 MW planned in two stages. It lists early works from June 2017 and main civil works from February 2018. Its completion dates conflict: Wikipedia's summary box says December 2027 and its text says stage I is planned for 2029. Works include a right-bank access road and relocation of the Karakoram Highway. The WAPDA project page could not be opened, so check WAPDA for current status.

Plan your visit

Nearest town
Dasu
Getting there

Dasu lies on the Karakoram Highway north of Besham. The highway is long and can be disrupted; confirm conditions locally. The works are not open to the public. More

Best months

May – Sep

The project

The dam is a roller-compacted concrete gravity structure, 242 m high and 570 m long, with a reservoir capacity of about 1.41 billion cubic metres. The powerhouse is underground, roughly 3.5 km downstream, working on a head of about 172 m. Stage I and stage II each have six 360 MW turbines, making 2,160 MW per stage and 4,320 MW in all. Annual output is put at about 21 TWh. It is owned by the Government of Pakistan and built by WAPDA, as part of WAPDA's Water Vision 2025.

Key dates: the National Economic Council's executive committee approved stage I on 29 March 2014, a groundbreaking followed on 25 June 2014, early works started in June 2017, a Chinese contractor began main civil works in February 2018, and a diversion tunnel was inaugurated in December 2018. A contract for the turbines, generators and transformers was signed in November 2019. Financing includes the World Bank, which approved further loans in 2020 and June 2024. The Executive Committee of the National Economic Council conditionally approved a revised stage I cost of Rs1.74 trillion (about US$6.2 billion) on 14 May 2025, against an original Rs479 billion in 2014 (Express Tribune, 15 May 2025).

As of December 2020 the works also included the right-bank access road, a relocation of the Karakoram Highway, a project colony, a 132 kV transmission line and resettlement sites.

What to see and do

There is nothing to visit. The site is an active construction area and is not set up for tourism.

  • Travellers on the Karakoram Highway pass through Dasu and Besham.

When to visit

Not applicable. The Karakoram Highway is generally easier in late spring to autumn.

Photography and safety

Dams are strategic sites. Do not photograph the dam works, powerhouse, intake structures, security posts or staff unless you have been told you may, and obey any guard. The area has had security incidents; Wikipedia lists a bus attack under the project but gives no date or detail. Do not stop or photograph near the works.

Good to know

  • Travel advice. For foreign visitors: the UK FCDO (updated 27 October 2026, checked 17 November 2026) advises against all travel to the Karakoram Highway between Mansehra and Chilas, which includes Dasu. Read the live page before you plan a journey.
  • Status. Under construction. Dates above are from Wikipedia and are not forecasts by this site.

Highlights

  • Under construction on the Indus
  • 242 m high, 4,320 MW planned in two stages
  • Main civil works began February 2018 (Wikipedia)
  • Sits on the Karakoram Highway

Getting there

Dasu lies on the Karakoram Highway north of Besham. The highway is long and can be disrupted; confirm conditions locally. The works are not open to the public.

Tips

  • Do not stop or photograph near the works.
  • Check the FCDO page for the Karakoram Highway.
  • Ask local police about current road conditions.

Sources and last checked

Last checked Confidence low3 sources3 still to check
Last checked
Method
Desk research from published sources
Confidence
low
Checked by
trek.pk research team

Researched from published sources; not yet checked on the ground by our team. Spot something out of date? Report a mistake.

Sources

Still to be checked on the ground (3)

  • Latest construction status and completion date from WAPDA
  • Date and details of the bus attack
  • Stage I completion year (Wikipedia gives 2027 and 2029; Dawn, 12 April 2025, reported a revised target of November 2028; check WAPDA)